Annual Work Program Archive
Each year the Montgomery County Planning Department prepares
and submits an annual program plan to the Planning Commission. The projects included
in the plan are divided into two categories: major and minor. Major projects include
those projects which involve a longer term committment of resources (sometimes
spread over multiple years) and personnel. Minor projects are generally shorter
in length and more narrowly focused. Although the previous work programs are mentioned
in the minutes of the Planning Commission, the full descriptions are available
from the Montgomery County Planning Department.
2003: Annual Work Program: New & Ongoing
Projects (Timeline)
2002: Annual Work Program: New & Ongoing
Projects (Timeline)
2001: Annual Work Program: New & Ongoing
Projects
2000: Annual Work Program: New & Ongoing
Projects
1999: Annual Work Program: New & Ongoing
Projects
2003: Annual Work Program: New & Ongoing Projects
|
| 1.COMPREHENSIVE PLAN
REVIEW AND REVISION |
PLANNING COMMISSION
- Participate individually as facilitators in the Community Facilitators
Initiative.
- Participate individually as members in Focus Groups.
- Provide overall supervision of the comprehensive planning process including
review and comment on (draft) plan chapters as they are completed.
- Review and comment on Planning Consultants reports and analysis.
- Submit (draft) plan to Board of Supervisors by target date December 31,
2003
PLANNING DEPARTMENT
- Plan and implement Community Facilitators Initiative to reach out to all
types of organizations and receive input from 1,000+ citizens into the planning
process.
- Plan and implement Focus Groups, an effort to involve interested citizens
in the development of goals, objectives, strategies and indicators for each
plan chapter.
- Complete development of (draft) plan chapters.
- Support work of Planning Commission and Planning Consultant.
- Continue planning education / public outreach (mailing lists, newsletters,
web page, etc.) to inform and involve citizens in the comprehensive planning
process.
PLANNING CONSULTANT (Herd Planning & Design)
- Complete "Cash Proffers" research and make presentations on
this information.
- If county decided to proceed of cash proffers, then develop cash proffer
implementation plan including policy guide for monetary contributions. Make
necessary presentations on this information.
- Complete "Land Use Designations" research and make presentations
on this information. Review Zoning Ordinance in light of findings.
- Prepare draft ìLand Use Designationsî map and make presentations
on draft map.
|
|
2. GEOGRAPHIC INFORMATION SYSTEM (GIS)
|
PLANNING DEPARTMENT
- Complete development of Strategic GIS Plan to guide GIS implementation
throughout county departments and agencies. Provide staff support to countys
GIS Management Committee which oversees GIS implementation.
- Complete data conversions from CADD Cadastral data (parcels and road
centerlines) to GIS data (parcels and geo-coded road centerlines).
- Integrate aerial photography from Virginia Base Mapping Program (VBMP)
into county GIS.
- Develop inclusive presentation approach that enables GIS data to be available
in the meeting room for use by Supervisors and Planning Commissioners.
|
|
3. LAND DEVELOPMENT OFFICE
|
PLANNING DEPARTMENT
- Begin software implementation to automate and manage departmental workflow
(rezonings, SUPs, variances, appeals, site plan review, 2232 reviews, subdivisions,
AFDs, complaints, etc.) and integrate all land development records with
GIS.
- Continue digitizing existing paper records for rezonings, SUPs, variances
and appeals.
|
|
4. COMMUNITY DEVELOPMENT BLOCK GRANT
|
PLANNING DEPARTMENT
- Administer $499,700 received by the county for renovation of 215 Roanoke
Street for use by Free Clinic including compliance with all state and federal
requirements.
|
| 5. FIELD REVIEW OF OUTSTANDING SUPs |
PLANNING DEPARTMENT
- Continue field review and documentation of 200+ outstanding SUPs. Determine
compliance with specified permit conditions. Take follow-up actions to bring
into compliance any sites that are not meeting all the conditions of their
SUP. Void SUPs found to be abandoned or discontinued for a period of 2 or
more years
|
|
6. COAL MINER'S PARK
|
PLANNING DEPARTMENT
- Conclude current activities including NPS/DCR grant administration for
Merrimac Link Trail, WPI Stream Restoration Project, Park Master Plan revision
(including Tipple/Hoist Area Plan for DMME) and on-line Globe Program in
coordination with the Natural History Museum and the Public Schools.
|
|
7. ALL-HAZARD MITIGATION PLAN
|
- Support New River Valley Planning District Commission staff in preparation
of regional plan that can then be adopted by Montgomery County for acceptance
by Federal Emergency Management Agency (FEMA) as countys local plan.
|
| Ongoing Project: ZONING ORDINANCE ADMINISTRATION |
PLANNING COMMISSION
- Review and recommend rezoning requests and special use permit requests.
- Review and recommend amendments to the Zoning Ordinance.
BOARD OF ZONING APPEALS (BZA)
- Review and decide variance requests and appeals of Zoning Administrator
decisions
- Review and decide special use permits (as applicable).
PLANNING DEPARTMENT
- Provide staff support to the Planning Commission and the Board of Zoning
Appeals.
- Prepare draft amendments to the Zoning Ordinance for Planning Commission
consideration
- Provide information and answer questions concerning the Zoning Ordinance
for developers and the general public.
- Enforce the Zoning Ordinance including review of building permit applications,
review of site plans, complaint investigation and follow-up, legal enforcement
actions, etc.
- Assist VCPA with regional training sessions for Planning Commission and
BZA members/alternates
|
| Ongoing Project: SUBDIVISION ORDINANCE ADMINISTRATION |
PLANNING COMMISSION
- Review and recommend plats for major subdivisions.
PLANNING DEPARTMENT
- Provide staff support to the Planning Commission in the review of major
subdivisions
- Review and approve plats for family subdivisions and minor subdivisions.
- Provide information and answer questions concerning the Subdivison Ordinance
for developers and the general public.
|
|
Ongoing Project: CAPITAL IMPROVEMENTS PROGRAM (CIP) |
PLANNING COMMISSION
- Review and recommend draft CIP with respect to Comprehensive Plan. Hold
public hearing if deemed necessary.
PLANNING DEPARTMENT
- Provide staff support for CIP process and the Technical Review Committee
|
|
Ongoing Project: GEOGRAPHIC INFORMATION SYSTEM
(GIS) |
PLANNING DEPARTMENT
- Continue to assign E911 addresses for new construction in the County.
- Continue support of public accessible GIS information on the internet
as exemplified by reassessment application
|
| Ongoing Project:
15.2-2232 REVIEW REQUIREMENT |
PLANNING COMMISSION
- Review streets, parks or other public areas, public buildings or public
structures, public utility facilities, etc. for compliance with the Comprehensive
Plan, Hold public hearings per Board of Supervisors policy.
|
| Ongoing Project: AGRICULTURAL &
FORESTAL DISTRICTS
(3 districts totaling 9,000 acres are scheduled for renewal in 2003.)
|
PLANNING COMMISSION
- Review any proposed additions to existing districts and compatible use
issues on an ìas neededî basis.
ADVISORY COMMITTEE FOR AGRICULTURAL & FORESTAL DISTRICTS
- Review and recommend proposed additions to existing districts and compatible
use issues on an ìas neededî basis.
PLANNING DEPARTMENT
- Provide staff support to the Commission and to the Advisory Committee
for Agricultural & Forestal Districts.
|
|
Ongoing Project: EROSION & SEDIMENT CONTROL PROGRAM |
PLANNING DEPARTMENT
- Assist County Engineer by providing certified inspector to carry out regular
inspections of land-disturbing activities in the county one day each week.
|
2002: Annual Work Program: New & Ongoing Projects
|
| 1.COMPREHENSIVE PLAN
REVIEW AND REVISION |
PLANNING COMMISSION
- Provide overall supervision of the comprehensive planning process.
- Decide on appropriate Ad Hoc Committee structure to involve interested
citizens in the ongoing development of the plan. Decide on appropriate structure
to involve Blacksburg, Christiansburg, Radford and Virginia Tech in the
ongoing development of the plan.
- Review and comment on Planning Consultants reports and analysis.
PLANNING DEPARTMENT
- Support work of Planning Commission and Planning Consultant.
- Complete development of "Plan Elements".
- Continue planning education / public outreach (mailing lists, news releases,
newsletters, webpage, speakers, etc.) to keep citizens informed and involved
in the comprehensive planning process.
PLANNING CONSULTANT (Herd Planning & Design)
- Complete "Coordination of Comprehensive Plan with other County plans"
research and report.
- Complete "15.2-2232 Review" research and report.
- Complete "Review and Coordination with other Comprehensive Plans
(Blacksburg, Christiansburg, Radford, Virginia Tech)" research and
report.
- Complete "Public / Private Lands for Conservation" research
and report.
- Complete "Cash Proffers" research
- Complete "Land Use Designations" research.
- Begin "Land Use Designations" map
|
|
2. COMPREHENSIVE PLAN AMENDMENT
(New Zoning Ordinance ties zoning closely to Comprehensive Plan designation.)
|
PLANNING COMMISSION
- Develop and implement policy for the regular review of specific Comprehensive
Plan amendment requests associated with rezoning requests.
|
|
COAL MINER'S PARK
|
COAL MINING HERITAGE PARK (CMHP) ADVISORY COMMITTEE
- Responsible for the development and long-term maintenance of the CMHP
at Merrimac.
PLANNING DEPARTMENT
- Transition staff support for the Coal Mining Heritage Park (CMHP) and
the CMHP Advisory Committee from Planning Department to the Parks &
Recreation Department.
- Complete current activities including Merrimac Link Trail (including NPS/DCR
grant administration), WPI Stream Restoration Project, Park Master Plan
revision (including Tipple/Hoist Area Plan for DMME) and on-line Globe Program
in coordination with the Natural History Museum and the Public Schools.
- Prepare TEA-21 and/or NPS/DCR grant application for Upper Merrimac Trail.
|
| 4. NORTH FORK - CATAWBA CORRIDOR
PROJECT, TEA-21 GRANT (if successful) |
PLANNING DEPARTMENT
- Administer first year grant including coordination with New River Land
Trust and Skyline Soil & Water Conservation District.
- Assist with preparation of grant application for second year of funding.
|
|
5. COMMUNITY DEVELOPMENT BLOCK GRANT (if successful) |
PLANNING DEPARTMENT
- Administer any grant received by the county.
|
|
6. VIRGINIA BASE MAPPING PROGRAM (VBMP) |
PLANNING DEPARTMENT
- Coordinate aerial mapping of County under VBMP.
- Establish Global Positioning System (GPS) procedure to map location of
all new construction.
|
| 7. METROPOLITAN PLANNING ORGANIZATION
(MPO) (if meet designation criteria) |
- Assist in implementation of MPO transportation planning process for Blacksburg,
Christiansburg and parts of Montgomery County
|
| Ongoing Project: ZONING
ORDINANCE ADMINISTRATION |
PLANNING COMMISSION
- Review and recommend rezoning requests and special use permit requests.
- Review and recommend amendments to the Zoning Ordinance.
BOARD OF ZONING APPEALS (BZA)
- Review and decide variance requests and appeals of Zoning Administrator
decisions.
PLANNING DEPARTMENT
- Provide staff support to the Planning Commission and the Board of Zoning
Appeals.
- Prepare draft amendments to the Zoning Ordinance for Planning Commission
consideration
- Provide information and answer questions concerning the Zoning Ordinance
for developers and the general public.
- Enforce the Zoning Ordinance including review of building permit applications,
review of site plans, complaint investigation and follow-up, legal enforcement
actions, etc.
- Assist VCPA/Virginia Tech in conducting a regional training sessions for
Planning Commission and BZA members/alternates.
- Continue to develop information hand outs to explain zoning requirements
to the public
|
|
Ongoing Project: SUBDIVISION ORDINANCE ADMINISTRATION |
PLANNING COMMISSION
- Review and recommend plats for major subdivisions.
PLANNING DEPARTMENT
- Provide staff support to the Planning Commission in the review of major
subdivisions
- Review and approve plats for family subdivisions and minor subdivisions.
- Provide information and answer questions concerning the Subdivison Ordinance
for developers and the general public.
|
|
Ongoing Project: CAPITAL IMPROVEMENTS PROGRAM (CIP) |
PLANNING COMMISSION
- Review and recommend draft CIP with respect to Comprehensive Plan. Hold
public hearing if deemed necessary.
PLANNING DEPARTMENT
- Provide staff support for CIP process and the Technical Review Committee
|
|
Ongoing Project: GEOGRAPHIC INFORMATION SYSTEM
(GIS) |
PLANNING DEPARTMENT
- Continue to assign E911 addresses for new construction in the County.
- Continue development of a geographic information system (GIS) for the
county using ArcCAD and ArcVIEW software.
- Continue support of public accessible tax parcel information on the internet.
- Work to insure that the countys GIS can be used by other departments and
agencies such as Real Estate, Sheriff, Public Service Authority, Economic
Development, etc.
|
| Ongoing Project:
15.2-2232 REVIEW REQUIREMENT |
PLANNING COMMISSION
- Review streets, parks or other public areas, public buildings or public
structures, public utility facilities, etc. for compliance with the Comprehensive
Plan, Hold public hearings per Board of Supervisors policy.
|
| Ongoing Project: AGRICULTURAL &
FORESTAL DISTRICTS
(No districts scheduled for renewal in 2002.)
|
PLANNING COMMISSION
- Review any proposed additions to existing districts and compatible use
issues on an ìas neededî basis.
ADVISORY COMMITTEE FOR AGRICULTURAL & FORESTAL DISTRICTS
- Review and recommend proposed additions to existing districts and compatible
use issues on an ìas neededî basis.
PLANNING DEPARTMENT
- Provide staff support to the Commission and to the Advisory Committee
for Agricultural & Forestal Districts.
|
|
Ongoing Project: EROSION & SEDIMENT CONTROL PROGRAM |
PLANNING DEPARTMENT
- Assist County Engineer by providing certified inspector to carry out
regular inspections of land-disturbing activities in the county one day
each week.
|
2001: Annual Work Program: New & Ongoing Projects
|
| Zoning Ordinance |
Planning Commission:
- Conduct one-year evaluation of new Zoning Ordinance for Board of Supervisors,
including technical changes and policy issues
Planning Department:
- Provide staff support to the Commission in their evaluation
|
| Redistricting |
Planning Department:
- Work with the County Attorney and Voting Registrar to provide necessary
staff support for the redistricting of the county election districts based
on the Year 2000 Census
|
| Comprehensive Plan
Review and Amendment |
Planning Commission:
- Provide overall supervision of the comprehensive planning process.
- Decide on appropriate Ad Hoc Committee structure to involve interested
citizens in the ongoing development of the plan. Decide on appropriate structure
to involve Blacksburg, Christiansburg, Radford, and Virginia Tech in the
ongoing development of the plan.
Planning Department:
- Prepare Request for Porposal(s) and hire planning consultant(s) as necessary
to assit with plan preparation.
- Prepare background information on "Plan Elements" and hold four
(4) public meetings (Round One) around the ocunty to receive citizen input.
- Put into place public information procedures (mailing lists, news releases,
newsletters, webpage, speakers, etc.) to keep citizens informed and involved
in the comprehensive planning process.
- Proceed sequentially to develop "Planning Areas," Land Use Designations,"
and "Comprehensive Plan Map.
|
| Coal Miner's Heritage Park/ Heritage
Park System |
Planning Department:
- Provide staff support to the Coal Mining Heritage Park (CMHP) Advisory
Committee in the development and long-term maintenance of the CMHP at Merrimac
- Prepare grant applications for the park funding and administer successful
grant programs
- Work on the concept of a Heritage Park and Trail system. It would ocnsist
of a series of interlocking parks highlighting the historical, cultural,
and natural features across the entire county. Investigate potential funding
sources.
|
| Planning Department Web Presence |
Planning Department:
- Impliment departmental Webpage that makes accessible rezoning proposals
and analyses, Commission minutes, building permits, and other public documents.
- Foster use of Internet tools for public communication and interactions,
such as email, IPLUS (Internet Parcel Look Up System), etc.
|
| Capital Improvements Program (CIP)--Ongoing
Project |
Planning Commission:
- Review and recommend draft CIP with respect to the Comprehensive Plan.
Hold public hearing if deemed necessary.
Planning Department:
- Provide staff for CIP process and the Technical Review Committee.
|
| Geographic Information Systems (GIS)--Ongoing
Project |
Planning Department
- Continue development of a geographic information system (GIS) for the
county using ArcCAD and ArcVIEW software.
- Work to insure that the county's GIS can be used by other departments
and agencies, such as Real Estate, Sheriff, Public Service Authority, Economic
Development.
|
| 15.2-2232 Review Requirements--Ongoing
Project |
Planning Commission:
- Prepare and adopt guidelines for the 2232 review process
- Review streets, parks and other public areas, public buildings or public
structures, public utility facilities, etc. for compliance with the Comprehensive
Plan. Hold public hearings as required by the Board of Supervisors.
|
| Erosion and Sediment Control Program--Ongoing
Project |
Planning Department:
- Assist County Engineer by providing certified inspector to carry out regular
inspections of land-disturbing activities in the county.
|
|
Agricultural and Forestal Districts
|
Planning Commission
- Review renewal of AFD-6 (Shawsville South), consisting of 1,514 acres
and 6 landowners, for compliance with the Comprehensive Plan
Planning Department
- Provide staff support to the Commission and to the Advisory Committee
for Agricultural and Forestal Districts in their review
|
| Roanoke River Corridor Flood Plain Mitigation Plan/ Community
Rating System |
|
Back to top
2000: Annual Work Program: New & Ongoing Projects
|
| Zoning Ordinance |
Planning Commission:
- Prepare and adopt Subdivision Ordinance amendments to match the new Zoning
Ordinance
- Conduct one-year evaluation of new Zoning Ordinance for the Board of Supervisors
Planning Department:
- Impliment the revised Zoning Ordinance, including: record keeping system
for sliding scale zoning, sign inventory and permit system, intensive agriculture
invenory, information meetings and handouts for engineers, surveyors, developmers,
farmers, the general public, etc.
|
| Comprehensive Plan Review and Amendment |
Planning Commission:
- Interview and hire Planning Consultant.
- Pick up where the Commission left off last February with work on Plan
Elements and Planning Areas. Liaisons aide in gathering existing plans/studies
of note since last Comprehensive Plan. Hold first round of public meetings
in each Planning Area by Fall.
Planning Department:
- Prepare Request for Proposal (RFP) to hire Planning Consultant.
- Conduct in-house work on Plan Elements and Planning Areas.
|
| 177 Corridor Area Study Update |
Planning Commission:
- Continue work with Radford Planning Commission and the NRVPDC staff to
update the Route 177 Corridor Area Study (1992) and then amend the joint
Comprehensive Plan for the Corridor Area.
|
| Coal Miner's Heritage Park/ Heritage Park System |
Planning Department:
- Continue work with Radford University Applied Anthropology class on the
design of a historic interpretive center and recreational facility for Coal
Miners Heritage Park in Merrimac. Community meeting to present report to
be held in early 2000. Develop grant application for park funding.
- Work on the concept of a Heritage Park and Trail system. It would ocnsist
of a series of interlocking parks highlighting the historical, cultural,
and natural features across the entire county. Investigate potential funding
sources.
|
| Planning Department Web Presence |
Planning Department:
- Work with county consultant to develop Planning and Inspections Department
Webpage that makes accessible rezoning proposals and analyses, Commission
minutes, building permits, and other public documents.
- Foster use of Internet tools for public communication and interactions,
such as email, IPLUS (Internet Parcel Look Up System), etc.
|
| Year 2000 Census |
Planning Department
- Review pre- and post-census maps and population data for the Census Bureau.
|
| Capital Improvements Program (CIP)--Ongoing Project |
Planning Commission:
- Review and recommend draft CIP with respect to the Comprehensive Plan.
Hold public hearing if deemed necessary.
Planning Department:
- Provide staff for CIP process and the Technical Review Committee.
|
| Geographic Information Systems (GIS)--Ongoing Project |
Planning Department
- Hire GIS Coordinator
- Add digital mapping layers for zoning, special use permits, agricultraul
and forestal districts, etc to completed tax aprcel mapping.
- Continue development of a geographic information system (GIS) for the
county using ArcCAD and ArcVIEW software.
- Work to insure that the county's GIS can be used by other departments
and agencies, such as Real Estate, Sheriff, Public Service Authority, Economic
Development.
|
| 15.2-2232 Review Requirements--Ongoing Project |
Planning Commission:
- Prepare and adopt guidelines for the 2232 review process
- Review streets, parks and other public areas, public buildings or public
structures, public utility facilities, etc. for compliance with the Comprehensive
Plan. Hold public hearings as required by the Board of Supervisors.
|
| Erosion and Sediment Control Program--Ongoing Project |
Planning Department:
- Coordinate Erosion and Sediment Program as an interim measure until County
Engineer is hired. Employ outside consultants to perform all plan review
and inspection functions.
|
| Roanoke River Corridor Flood Plain Mitigation Plan/ Community
Rating System |
|
Back to top
1999: Annual Work Program: New & Ongoing Projects
|
| Zoning Ordinance |
Planning Commission:
- Assist Board of Supervisors in their review and approval
Planning Department:
- Assist Board of Supervisors in their review and approval
- After adoption, implement the revised Zoning Ordinance, including record
keeping system for sliding-scale zoning; information meetings and handouts
for engineers, surveyors, developers, etc.
|
| Comprehensive Plan Review and Amendment |
Planning Commission:
- (1st Qtr) Review current Comprehensive Plan and (1) select elements for
revision, (2) select work to be done in-house and work to be done by an
outside consultant. Elements already identified for revision include:
- Comprehensive Plan Map
- Water & Sewere Element (Board resolution)
- Transportation Element
- Others?
- (2nd Qtr) Begin in-house work. Prepare Request for Proposal (RFP) and
hire planning consultant. (Funding in FY98-99 budget)
- (3rd/4th Qtrs) Complete work, prepare necessary text and/or map amendments
to the Comprehensive Plan and hold public hearings. Make recommendations
on amendments to the Board of Supervisors.
- (4th Qtr time permitting) Begin preparation a neighborhood planning element
for the Riner Rural Expansion Area.
- Work with Radford Planning Commission and NRVPDC staff to study Route
177 Corridor Area and amend joint Comprehensive Plan for the Corridor Area.
Planning Department:
- Conduct in-house portion of the work
- Assist with hiring of a planning consultant
|
| Year 2000 Census |
Planning Department
- Review pre- and post-census maps and population data for the Census Bureau.
|
| Flood Mitigation Plan |
Planning Department
- Prepare plan that could lead to funding under the Flood Mitigation Assistance
(FMA) Program that addresses repetitively damaged structures.
|
| Planning Department Web Presence |
Planning Department:
- Continue work on Planning and Inspections Department Webpage that makes
accessible rezoning proposals and analyses, Commission minutes, building
permits, and other public documents. Coordinate with the Public Information
Officer.
- Foster use of Internet tools for public communication and interactions,
such as email, IPLUS (Internet Parcel Look Up System), etc.
|
| Capital Improvements Program (CIP)--Ongoing Project |
Planning Commission:
- Review and recommend draft CIP with respect to the Comprehensive Plan.
Hold public hearing if deemed necessary.
Planning Department:
- Provide staff for CIP process and the Technical Review Committee.
|
| Geographic Information Systems (GIS)--Ongoing
Project |
Planning Department
- Coninue working with Information Management Services and Real Estate departments
on digital mapping of real estate data for the inincorporated portion of
the ocunty. The project is currently 80% complete.
- Continue development of a geographic information system (GIS) for the
county using ArcCAD and ArcVIEW software.
- Work with county's Information/ Data Committee and technical consultant
(F One Consulting) to insure that the county's GIS can be used by other
departments and agencies, such as Real Estate, Sheriff, Public Service Authority,
Economic Development.
|
| 15.2-2232 Review Requirements--Ongoing Project |
Planning Commission:
- Review streets, parks and other public areas, public buildings or public
structures, public utility facilities, etc. for compliance with the Comprehensive
Plan. Hold public hearings as required by the Board of Supervisors.
- (1st Qtr) Prepare and adopt guidelines for the 2232 review process
|
| Roanoke River Corridor Flood Plain Mitigation Plan/ Community
Rating System |
|
|
|