As Montgomery County moves into the 21st century, it is seeking ways to enhance its planning tools to promote sound decision making and investment by both the public and private sector. Since 1977, with the adoption of its first comprehensive plan, Montgomery County has recognized the need to plan its future.

A comprehensive plan is especially useful and important in a growing community where new development creates demands for new services and facilities that are typically the responsibility of the local government and that are usually funded by tax payers. The comprehensive plan can help a community anticipate the need for public investment based on planned land uses. It also guides development to appropriate areas that will have the services and utilities required to support a particular land use, and away from areas where other land uses, such as agriculture, are most appropriate. For private landowners, the comprehensive plan provides some certainty about how adjoining land will be used. A good comprehensive plan also provides for a balance of land uses designed to achieve community goals and objectives in a fiscally responsible manner.

To help Montgomery Country revise its comprehensive plan, Herd Planning & Design, Ltd. evaluated the following County documents for consistency with the County's existing Comprehensive Plan:

  1. 2002-2003 Capital Budget,

  2. Public Services Authority Six Year Capital Forecast,

  3. Library System Plan (2001-2006),

  4. Strategic Plan for Economic Development Plan,

  5. School Enrollment projections (November 2001) and

  6. School Facility Master Plan (July 2000).

Since these documents help guide public investment, they should be coordinated with the comprehensive plan to assure that the County is approaching public service delivery and facility expansions in a manner consistent with the County's planned growth. The following is a summary of how these documents currently relate to the comprehensive plan and where there are opportunities to strengthen the coordination between the new comprehensive plan and other County documents.

FINDINGS

Montgomery-Floyd Regional Library System L.I.F.E. Plan (2001-2006)

This document is primarily an operational plan for the delivery of library services. Of the seven categories included in the plan (Facilities, Public Relations, Customer Service, Technology, Collection, Outreach/Partnerships, Programs), only the Facilities section of the Plan contains references to the construction of a new library facility in Eastern Montgomery County, known as the proposed Alleghany Branch library. There are no real conflicts between the existing Comprehensive Plan and the Library System Plan since there is very little detail about the land use and fiscal implications of future library needs in either document. There are opportunities to better integrate this document with the Comprehensive Plan and to assure the fiscal and physical needs of the library system are met proactively as growth occurs.

A. Relevant Goals/Policies/Strategies from Comprehensive Plan, Community Facilities Element, p. 31-32:

1. GOAL CF 1.0.0: Provide adequate public facilities necessary to meet the needs of an increasing county population.

2. POLICY CF 1.1.0: Develop effective management tools to balance the need for public facilities with the supply of available funding.

3. STRATEGY CF 1.1.1: Prepare annually a Capital Improvements Program (CIP) in order to schedule and finance necessary public improvements over a five-year period.

4. POLICY CF 1.2.0: Continue to explore cooperative arrangements with neighboring governmental units that would provide necessary public services more efficiently and more effectively.

5. POLICY CF 1.3.0: New county facilities (schools, libraries, etc) should be designed to accommodate several functions such as gyms and meeting rooms. Additional acreage at these sites could also provide recreational open space. These multi-use facilities could be utilized during the evenings and weekends.

B. Related Goals/Policies from the Library Plan, Facilities Section, p. 6

1. GOAL 3: To build a library for eastern Montgomery County which will enhance the growth and economic development potential by serving the needs of a growing community.

2. GOAL 4: To continuously evaluate and adjust space needs relative to service requirements of the community.

3. OBJECTIVE 5, GOAL 1: To establish a community gathering place within each facility, by September 2003.

4. OBJECTIVE 3, GOAL 4: To search for new sources for funding for an Alleghany Branch, beginning January 2002.

C. Comments

1. Assessment: There are no real conflicts between the Library Plan and the goals and policies of the Comprehensive Plan. However, the Alleghany Branch library is not identified or specifically anticipated in the current Comprehensive Plan. The facility is generally supported by Goal CF 1.0 which seeks to provide adequate facilities for a growing population. The project is identified in the County's CIP in accordance with Strategy CF 1.1.1 and as, a regional facility supported by Montgomery and Floyd Counties, is implementing Policy CF 1.2.0.

2. Opportunities for Improved Coordination: The Montgomery-Floyd Library plan is an example of what is known in some jurisdictions as a service or operational plan. In some communities, all agencies that deliver public services, such as Parks and Recreation, Fire and Rescue, and the Sheriffs Office, have these types of plans. The best of these plans provide clear standards for service delivery that can be used to measure how well a community is meeting existing needs and what improvements need to be provided to address service deficits and anticipate future needs. Sometimes such service plans are formally adopted as elements of the jurisdictions comprehensive plan. The County should consider this option.

The Comprehensive Plan and agency service plans overlap in three key areas: (i) identifying future service needs (what new facilities are needed), (ii) determining how these needs will be met (where should facilities be constructed, how much space/land is needed) and (iii) determining how new facilities will be funded. More detail is needed in both types of documents to fully address these issues and the related goals and policies. Such detail might include the following.

a. Projections of future need: The Montgomery County Comprehensive Plan can provide important information about future growth to agencies that provide services to the public. Since the Comprehensive Plan identifies future growth areas, service agencies can determine where service improvements or modifications will most likely be needed. The more detailed the Comprehensive Plan, the more useful it becomes as a planning tool for agencies delivering services. In turn, the service or agency plans become valuable tools for budgeting.

To further link the Comprehensive Plan to the provision of services, Montgomery County could evaluate the feasibility of using the four geographic planning areas for service agency planning. The four planning areas may be useful as a common basis for forecasting future needs and sharing data between agencies. This would be particularly useful if the planning area boundaries coincide with census tracts or other data sets that may be used to project population growth. The Planning Department could provide area specific population forecasts based on projected build-out or population estimates that could be used to estimate facility or programming needs for a particular area of the County. (At the least, geographic service areas should be defined for each type of service and then these areas should be made to coincide as much as is practical).

b. Service and Facility Standards: Plans developed by public service agencies often include a measurable service standard to assess how well a community is meeting existing needs and how the service will need to be expanded or modified for future growth. For example, a library board may adopt a goal of providing 1.0 square feet of library space per resident. Using population estimates and forecasts, as well as the location of expected growth and the location and size of existing facilities, a community can project how much additional library space is needed to meet its service goals and where it should be located. Information about projected needs and existing deficits can be included in a comprehensive plan and considered both during the CIP process and as private development applications are considered. Library space standards are defined by the state as a guide for localities, but may be tailored to fit the particular needs of each community.

Additionally, as a land use document, the comprehensive plan should address how public facilities are to be physically located in the community. For example, if the County wants libraries to be multi-purpose community based facilities, located primarily in residential areas, both the Library Plan and the Comprehensive Plan should include this information. A service agency plan may provide even more detail, describing desirable site and facility sizes and characteristics.

c. Funding: Many public agencies are seeking new or additional funding sources for public improvements. Counties in Virginia frequently receive voluntary proffers of cash or land for public facilities when a property is rezoned. These proffers are intended to help offset the demand for services generated by the new development. To successfully evaluate development proffers, the County must have a clear picture of projected needs. The comprehensive plan and agency service plans can provide this information. Similarly, these plans can be used during the CIP process to set budgeting priorities.

Department of Economic Development Draft Strategic Plan, September 30, 2001

This four year strategic plan for Economic Development Activities in Montgomery County includes four major elements: Workforce Development, Product Development, Business Development and Recruitment Development. It provides an overview of the forces shaping economic development nationally and regionally and how these forces affect the local economy, work force and business development opportunities. The report emphasizes how technology and the global economy have changed the work place and how Montgomery County can best position and market itself with respect to emerging industries. It also provides strategies for protecting, retaining and growing existing local businesses and industries. While the majority of the document is focused on marketing, recruitment and training initiatives, there are recommendations that have implications for land use and development that should be addressed as the Comprehensive Plan is reviewed.

A. Relevant Goals/Policies/Strategies from Comprehensive Plan, Economy Element, p. 27-29:

1. GOAL EC 1.0.0: Promote and develop the economy of the New River Valley to its fullest potential while diligently preserving our high environmental quality and unique cultural environment.

2. POLICY EC 1.1.0: The County, Blacksburg and Christiansburg should continue as a major force of economic development for the New River Valley. The projected regional population growth for the years 1990-2000 is +10,000 for the region of which +7,500 is for Montgomery County.

3. STRATEGY EC 1.1.2: Encourage economic diversification in order to help accommodate the projected population growth for the County and to help provide employment for all county citizens.

4. POLICY EC 1.2.0: Provide economic opportunity in quality industry for all county residents.

5. STRATEGY EC 1.2.1: Attract new industrial development that can both utilize initial labor force skills and upgrade those skills with job experience and training. In this way employees can develop breadth and flexibility in their skills and also acquire a willingness to learn new skills over the long term.

6. STRATEGY EC 1.2.2: Work with existing industry and educational institutions to upgrade literacy and labor force skills in order to raise job productivity. Continual training is an essential ingredient for greater worker responsibility and commitment.

7. POLICY EC 1.3.0: Encourage the development of start-up companies, entrepreneurial activities, small firms, corporate laboratories, or groups, and various specialized firms, which benefit residents of the County by cooperating with other existing resources and encouraging regional economic development.

8. POLICY EC 1.4.0: Encourage positive trends in commercial and industrial development.

9. STRATEGY EC 1.4.1: Support the redevelopment and diversification of existing commercial areas throughout the County by encouraging additional parking, landscaping, benches, etc.

10. STRATEGY EC 1.4.2: Encourage the planned commercial and industrial development of the 460 Corridor Area in order to provide compatible growth, retain important environmental qualities, and meet the needs of residents.

11. POLICY EC 1.5.0: Work to retain high quality of life. A good balance between urban and rural areas should be continued.

12. STRATEGY EC 1.5.1: Designate land for both urban expansion and open space. Water and sewer should be extended to those areas designated for urban expansion.

13. STRATEGY EC 1.5.2: Develop and promote local and regional industrial parks and coordinate recreational opportunities with facility development.

14. POLICY EC 1.6.0:The County, Blacksburg and Christiansburg should identify and when appropriate procure additional industrial land.

15. STRATEGY EC 1.6.1: The County, Blacksburg and Christiansburg should provide necessary infrastructure and the appropriate zoning for future industrial sites to help in the marketing and development of such areas.

16.POLICY EC 1.7.0: Study and promote non-manufacturing forms of economic development such as agriculture, tourism, and retirement that take advantage of the County's scenic beauty and excellent access via Interstate-81.

B. Related Goals/Policies from the Draft Strategic Plan for Economic Development

1. Objective 2 for Product Development, p. 12: To develop new ready to go Industrial Product in Montgomery County, including shell buildings.

2. Objective 3 for Product Development, p. 12: Increase Broadband Telecommunications in Montgomery County.

3. Strategy 1 for Product Development, p. 12: To expand the main Industrial Parks available Industrial property including: Falling Branch Industrial Park, Christiansburg Industrial Plan, Blacksburg Industrial Plan; and develop a new shell building in Christiansburg.

4. Strategy 7 for Product Development, p. 13: To encourage the development of industrial property in the three localities comprehensive plans.

5. Strategy 8 for Product Development, p. 13: To partner with telecommunications and other utility providers to ensure Montgomery County has available to it the latest infrastructure.

6. Marketing and Recruitment Objective 1, p. 24: To attract to Montgomery County those target industries defined earlier. (These include Transportation: aircraft, automotive, and truck component and development and manufacturing; Biotechnology: Biotech/Biomed research, pharmaceutical research, development, and manufacturing; Information Technology: Component research, development and manufacturing, telecommunications, fiber-optics and electronic sub-components)

7. Marketing and Recruitment Objective 2, p. 24: To focus on those Existing Industry Clusters, with a high tech component, in order to attract similar firms to the region. Examples include transportation, rubber and plastics, machinery, except electrical, and electrical and electronic equipment.

8. Marketing and Recruitment Objective 3, p. 24: To increase the assessed valuation of Commercial and Industrial Real Estate to 30% from 19% and decrease the assessed valuation of residential real estate to 70% from 81%

C. Comments

1. Assessment: There are no obvious policy conflicts between the County's existing Comprehensive Plan and the Economic Development Draft Strategic Plan. However, many of the goals and strategies listed in the existing Comprehensive Plan would be more appropriately located in the Economic Development Plan. In fact, several of these policies are addressed in some form in the draft plan. The Comprehensive Plan should be updated to reflect the County's desire to attract the types of industries listed in the draft Economic Development Strategic Plan, to provide upgrades in the telecommunications network and utilities serving the County that are consistent with the regions recently adopted policies for telecommunications, and to identify and designate additional land for non-residential development in appropriate locations. Vague policies should be deleted or revised to give sufficient guidance for reviewing development applications for non-residential development. Also, the Zoning Ordinance should be evaluated to assure that the targeted industrial uses would be permitted in the County. For the Economic Development Strategy document, it would be useful to provide a map showing the location of the County and any industrial parks referenced in the plan. It would also be beneficial to have a map of proposed and existing commercial areas (retail, office and industrial) in the County.

2. Opportunities for Improved Coordination: The Economic Development Strategy and the current Comprehensive Plan would be greatly enhanced by updated descriptions of existing economic centers in the County, particularly if these are to be the focus of future development activity. A complete marketing and economic development strategy for the County should include identification of key areas or key corridors, with a description of the type of development envisioned along corridors or in areas identified as centers for economic development. To appropriately direct the infrastructure investment required by high tech industries (such as fiber optic cable extensions and broadband communications), the County should focus on a few key areas or corridors that currently meet the needs of these types of industries or that are appropriate for such uses. Economic Development staff could work with planning staff to identify the site specific infrastructure needs of the targeted industries as a means of determining which areas of the County are most suited to these industries. Further, forecasts can be made of jobs in each industrial sector and an estimate made of building and land capacity necessary to accommodate forecasted employment growth. This information will assure that the updated Comprehensive Plan identifies sufficient acreage for future industrial development. Similarly, the County should determine if there will be additional demands for commercial retail development, based on projected growth, that should be accommodated in the land use policies of the Comprehensive Plan. As with Libraries (and other services as well), it could be beneficial for the County to formally adopt the EDSP as an element of the Comprehensive Plan.

Montgomery County Public Schools

Montgomery County recently contracted with DeJong & Associates to provide a Facility Master Plan Report (July 2000) and Enrollment Projections Report (November 2001) for its public schools. The projected enrollment report contains 10-year forecasts for each school strand: Auburn, Blacksburg, Christiansburg and Shawsville. The school population forecasts were developed based on the cohort survival method. The consultants took into account births and historical enrollment figures to age the student population as it enters and/or moves through each grade over the next 10 years. The consultant did not use projected students per household to forecast student population since the number of housing permits issued since 1997 has decreased faster than the student enrollment has declined. The most likely enrollment projections, suggest that student population will range over the next 10 years from a low of 9,053 (2005-2006) to a high of 9,244 (2011-12). Student enrollment is projected to increase steadily in the Auburn and Christiansburg strands, and decline steadily in the Blacksburg and Shawsville strands.

The Facility Master Plan includes a detailed inventory and analysis of existing school facilities and provides recommendations for upgrading facilities that do not meet current standards. The Facility Master Plan includes the following standard, derived from recent construction nationwide, to assess school facilities in Montgomery County:

Elementary School: 100 to 300 sq. ft. per student

Middle School: 120 to 150 sq. ft. per student

High School: 150 to 200 sq. ft. per student

Suggested Site Size Standards used in the Facility Master Plan are as follows:

Elementary School: 10 useable acres plus one acre for every 100 students

Middle School: 20 useable acres plus one acre for every 100 students

High School: 30 useable acres plus one acre for every 100 students

The information in the School Facility Plan was used to develop the list of school projects included in the County's 5-year Capital Budget (CIP) document. Only one new school, Christiansburg Middle School, is proposed for construction in the Capital Budget. Construction is proposed for FY 02. The CIP also includes 11 other school renovation/ expansion projects over the next 5 years.

A. Relevant Goals/Policies/Strategies from Comprehensive Plan, Community Facilities Element, p. 31-32:

1. GOAL CF 1.0.0: Provide adequate public facilities necessary to meet the needs of an increasing county population.

2. POLICY CF 1.1.0: Develop effective management tools to balance the need for public facilities with the supply of available funding.

3. STRATEGY CF 1.1.1: Prepare annually a Capital Improvements Program (CIP) in order to schedule and finance necessary public improvements over a five-year period.

4. POLICY CF 1.3.0: New county facilities (schools, libraries, etc) should be designed to accommodate several functions such as gyms and meeting rooms. Additional acreage at these sites could also provide recreational open space. These multi-use facilities could be utilized during the evenings and weekends.

B. Related Goals/Policies from the Facility Master Plan, Vision Statement, p.4

1. STATEMENT 2: The MCPS will be adequately and responsibly funded and supported by the citizens of Montgomery County.

2. STATEMENT 6: All schools will serve as community centers.

C. Comments

1. Assessment: There are no real conflicts between the School Facility Plan and the goals and policies of the Comprehensive Plan. Specific school improvements and new school construction are not addressed in the current Comprehensive Plan. New school facilities and school improvements are generally supported by Goal CF 1.0 which seeks to provide adequate facilities for a growing population. Proposed school projects are identified in the County's CIP in accordance with Strategy CF 1.1.1. The document should include a map identifying the location of existing and proposed schools.

2. Opportunities for Improved Coordination: The School facility plan provides specific site standards and per pupil standards that can be used to measure existing school deficiencies and to anticipate future needs. It may be appropriate to incorporate the school site standards into the Comprehensive Plan for use during review of large scale rezoning applications that might result in a proffer of land for a school site. Additionally, if the County is to implement the portion of the school vision statement seeking to have schools act as community centers, the comprehensive plan should address locational criteria for schools.

The size and function of school facilities can also have community design and land use implications. A high school serving 2000 students may be too large to fit comfortably in some residential communities without careful planning. Building design also has land use implications. For example, a one-story structure requires a larger site than a multi-story structure. Further, site design characteristics (such as pedestrian accessibility) will determine whether a school is effectively integrated with its surrounding neighborhoods.

The four geographic planning areas identified in the Comprehensive Plan should be evaluated to determine how they relate to the four school strands, based on school districts. The four planning areas may be useful as a common basis for forecasting future needs and sharing data with public school officials. In addition to current funding sources available for public school construction, Counties in Virginia frequently receive voluntary proffers of cash or land for public schools during the rezoning process.

Montgomery County Capital Improvement Budget/CIP FY 2002-2006

The Code of Virginia, Section 15.2-2239 states that a local planning commission may, and at the direction of the governing body shall, prepare and revise annually a capital improvement program based on the comprehensive plan of the locality for a period not to exceed the ensuing five years.… This is one of the most important budgeting and planning tools available to local government. The capital improvement program (CIP) is a five year plan identifying how public resources should be allocated to meet public demands to construct, repair, upgrade or replace public facilities such as schools, libraries, parks, etc. The CIP includes cost estimates for each facility, the proposed source of funding and a schedule for completing proposed improvements. This document is used to develop the annual Capital Budget document.

Montgomery County's CIP for FY 2002-2006 includes 18 projects, totaling $56,483,347. The 12 projects proposed by the County's school system accounts for approximately 80% of the proposed expenditures. Expenditures for operation and maintenance are not included in the CIP.

A. Relevant Goals/Policies/Strategies from Comprehensive Plan, Community Facilities Element, p. 31

1. GOAL CF 1.0.0: Provide adequate public facilities necessary to meet the needs of an increasing county population.

2. POLICY CF 1.1.0: Develop effective management tools to balance the need for public facilities with the supply of available funding.

3. STRATEGY CF 1.1.1: Prepare annually a Capital Improvements Program (CIP) in order to schedule and finance necessary public improvements over a five-year period.

B. Related Goals/Policies from the CIP

1. CAPITAL IMPROVEMENT BUDGET POLICY 1: The County will consider all capital improvements in accordance with an adopted capital improvement program.

2. CAPITAL IMPROVEMENT BUDGET POLICY 2: The County will develop a five-year plan for capital improvements and update each annually.

C. Comments

1. Assessment: The relevant CIP goals and the Comprehensive Plan goals do not conflict. The County's CIP process requires that all proposed CIP projects be reviewed for conformity with the Comprehensive Plan. Since the current comprehensive plan makes very few specific recommendations for capital facilities improvements, the plans broad Community Facility goals are used to evaluate projects. It would be very useful to provide a map in the Comprehensive Plan showing the location of all existing and proposed public facilities. This map can serve as a guide to evaluate both CIP projects and projects that must be evaluated for conformity with Section 15.2-2232 of the State Code. A map indicating the location of CIP projects would also be useful.

2. Opportunities for Improved Coordination: The Comprehensive Plan and CIP are powerful land use and fiscal planning tools. As the County undertakes its Comprehensive Plan revision, there is an opportunity to increase the level of detail in the Comprehensive Plan to accurately project future public facility needs. If the County's planning areas become the basis for service planning, public facilities needs can be identified and planned on a sub-area basis. The use of cash proffers as a funding option for new facilities would also require a realistic and defensible assessment of future public needs. Phasing policies or other mechanisms aimed at guiding development to the most appropriate areas at the most appropriate time would also allow the County to grow in an affordable manner. While the CIP document identifies immediate (5 year) investment priorities for the County, a more detailed comprehensive plan can be used to develop a longer term (10-20 year) public investment strategy. It also becomes an important tool for identifying what, if any, facilities may be partially funded through development proffers.

Montgomery County Public Service Authority Five Year Capital Forecast

The Montgomery County Public Service Authority capital forecast identifies the timing of funding for water and sewer improvements proposed to occur in the five year period from FY 01-02 to FY 05-06. The five year capital forecast is a budgeting rather than a planning tool and does not include specific goals and policies for utility extensions and improvements. The PSA plan includes 12 proposed sewer projects and 15 proposed water projects. The majority of these projects are maintenance of, or upgrades to, existing facilities. Six of these projects are major sewer and water investments.

While these projects are not described in the PSA capital forecast, they are described in the County's Comprehensive Plan. In 1999 and in January 2002, the County amended the Comprehensive Plan to include a list of 26 sewer and water projects for informational purposes. These projects are listed in Appendix A. The descriptions in the Comprehensive Plan text are technical in nature. The Plan notes that each specific project must be evaluated for compatibility with the Comprehensive Plan.

A. Relevant Goals/Policies/Strategies from Comprehensive Plan, Water and Sewer Element, p. 15-16:

1. GOAL WS 1.0.0: Provide public water and sewer systems that are cost effective and necessary to protect the health and safety of county residents and that promote economic development of the county.

2. STRATEGY WS 1.1.1: Use the recommendations of the Countywide Study (as revised) as guidelines in the construction of new public water and sewer systems and the expansion of existing systems. The objectives of the Countywide Study include:

Provide a planning document to aid in the yearly budget process for capital expenditures.

Provide plans for developing the infrastructure for orderly economic growth and industrial development.

Provide a means of supplementing the Comprehensive Plan in order to direct growth, allow for the economic provision of water, and waste water services to growth areas.

3. STRATEGY WS 1.2.4: Adopt a mandatory connection policy to require new development within a reasonable distance of a public water and sewer system to connect to the public system. Moreover, existing development within a reasonable distance of a public water and sewer system shall be encouraged to connect to the public system when such connections will result in a more cost effective system.

4. POLICY WS 1.3.0: Cooperative water and sewer arrangements with neighboring governmental units are encouraged whenever such arrangements are cost effective, necessary to protect the health of county residents and consistent with county, town and city comprehensive plans.

B. Relevant Goals/Policies/Strategies from the PSA Five Year Capital Forecast

There are no specific goals or policies in the PSA Five-Year Capital Forecast. The major projects proposed in the five year forecast are as follows:

1. Sewer Projects:

a. Lower Slate: The Lower Slate Branch Interceptor extends from the existing Stroubles Creek Interceptor to the unnamed tributary of Slate Branch that flows from the Corning Site. The Lower Slate Branch Interceptor will consist of 10,000 L.F. of 18" sewer and 9,800 L.F. of 21" sewer. Individual service areas that will connect to the interceptor will require additional facilities and are evaluated separately.

b. Route 177 Improvements: Expansion of sewer service into the Route 177 corridor.

c. Ellett Valley (Sewer): No description except mention of sewer service in Ellett Valley Water improvement discussions.

2. Water Projects:

a. Prices Fork Water: This would consist of waterline improvements between the Prices Fork and Longshop communities. A new 350,000 gallon water storage tank would be constructed on Route 655 and the existing Prices Fork tank would be abandoned. A waterline extension would be made from Prices Fork to the Blacksburg corporate limits along Prices Fork Road. A line extension south from the 12 water main on Prices Fork Road at the Corporate Limits could be made to connect the Merrimac system. This would provide the primary feed to Merrimac. Growth along the Route 657 corridor is not expected to be significant. However, the project will greatly enhance system reliability for the PSA. Replacement of inadequate 2 lines in the existing system would boost water pressure and allow fire protection to be provided to existing and future customers along these roads. This project also includes the interconnection of the Merrimac and Merrimac/Midway systems for added reliability.

b. Ellett Valley Water: Access from the southeast portion of Blacksburg has been improved with the extension of Nellies Cave road to Route 723 near Country Club Estates. The 6" water main could then be extended south along Route 723 to Ellett and eventual loop back to Town along Route 603 to the industrial park area. Since the Blacksburg system is much higher in elevation, several pressure reducing stations would be required. The customer base for this type of expenditure does not appear to be available in the next 20 years. However, more rapid growth may be realized if the new "smart highway" is constructed through the area. Providing water and sewer infrastructure would also enhance the residential growth in the area.

c. Mudpike to Woodview: An extension of the existing Christiansburg water main of approximately 500 feet from Heritage Place would permit service to residential development along Mudpike Road and to the Viewland subdivision, which is currently served by a private system. Adequate storage is provided by the Christiansburg 1.5 MG tank. Mudpike Road from Viewland to Woodview has scattered residential development. The PSA operates a small water system serving 13 customers at Woodview. Service to this area could be provided by an 8" water main extension from Christiansburg through Viewland.

C. Comments

1. Assessment: Montgomery County has established policies and criteria for Urban and Rural Expansion Areas, Rural Areas, Agricultural Areas and Conservation Areas and mapped their locations. It appears that several of the proposed sewer and water line improvements cross or expand identified urban and rural service areas. This is inconsistent with the comprehensive plan and weakens the County's ability to guide development to the most appropriate locations.

2. Opportunities for Improved Coordination: Since growth and development usually follow sewer and water lines, utility extensions should be carefully controlled to implement the desired development plan outlined in a communitys comprehensive plan. The extension of sewer and water facilities is also used as a means of phasing development to direct public investments to identified areas. Ideally, major sewer and water improvements should be proposed in areas identified for development and should occur as development is occurring. Uncoordinated and scattered development may result if sewer and water improvements occur too far in advance of demand. This in turn can lead to an inefficient pattern of public investment and service delivery. It can also preclude development of land for its most valuable and appropriate use.

To guide development to desired locations, utility line extensions, except in the case of an existing public health hazard, need to stay within defined service boundaries. Sewer and water lines should not be extended to promote growth in an area unless that area is planned for levels and types of development that require sewer and water service. As the new comprehensive plan is developed, the list of proposed sewer and water improvements needs to be re-evaluated to be sure that the proposed improvements properly implement plan policies.

APPENDIX A

The following 26 water and sewer projects were incorporated into the 1990 Comprehensive Plan as an informational resource on the engineering feasibility with the approval of a plan amendments in August 1999 and January 2002.

MT. TABOR PLANNING AREA (1 project)

Ellett Valley (Water)

Access from the southeast portion of Blacksburg has been improved with the extension of Nellies Cave road to Route 723 near Country Club Estates. The 6" water main could then be extended south along Route 723 to Ellett and eventual loop back to Town along Route 603 to the industrial park area. Since the Blacksburg system is much higher in elevation, several pressure reducing stations would be required. The customer base for this type of expenditure does not appear to be available in the next 20 years. However, more rapid growth may be realized if the new "smart highway" is constructed through the area. Providing water and sewer infrastructure would also enhance the residential growth in the area.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

SHAWSVILLE / ELLISTON PLANNING AREA (2 projects)

Lafayette Distribution System (Water)

[No text. See "Water Systems Map 6"]

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Brake Branch (Sewer)

The Brake Branch sewer service area is located along Secondary Route 631 and Brake Branch east of Elliston. The facilities required to provide public sewer service to the area consist of 3,800 L.F. of 4" gravity sewer line. This line will discharge flow to an existing Elliston gravity sewer along Secondary Route 631. It will serve an existing trailer park.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

RINER/BETHEL PLANNING AREA (7 Projects)

Riner Expansion (Sewer)

Expand and upgrade as necessary the existing Riner wastewater treatment plant from 35,000 gpd to 100,000 gpd. Major features of the plant expansion and upgrade would include preliminary treatment, new aeration tank, new clarifiers, new ultra-violet disinfection system, new aerobic sludge digestion tank, sludge disposal at Elliston-Lafayette plant, new blowers, existing plant rehabilitation and a standby generator. Expansion costs for the Riner plant have been included in the total project cost for the construction of the new elementary school.

Source: "PER Riner Sewer System" Gerald Mabry P.E., Utilities Engineer April 1, 1996.

Christiansburg to Viewland (Water)

An extension of the existing Christiansburg water main of approximately 500 feet from Heritage Place would permit service to residential development along Mudpike Road and to the Viewland subdivision, which is currently served by a private system. Adequate storage is provided by the Christiansburg 1.5 MG tank.

Source: "Comprehensive Water and Wastewater Study" Anderson & Associates Nov. 24, 1993; "Mud Pike Area Water Agreement" Sep. 24, 1994".

Route 666/658 (Sewer)

A proposed pump station on Route 658 in the vicinity of Sowers Mobile Home would connect by force main to the existing force main under Interstate-81.

Source: "Comprehensive Water & Wastewater Study "Anderson & Associates Nov. 24, 1993; "Per Route 177/Radford Community Hospital Utility Extensions" Anderson & Associates Feb. 17, 1995.

Bethel-Plumb Creek (Water)

Construct of an 8" water line from the Bethel system along Route 600 to the Plum Creek system. Potential for residential or commercial development along this route is not considered high. However, the interconnection would increase overall system reliability.

Source: "Comprehensive Water and Wastewater Study" Anderson & Associates Nov. 24, 1993.

Viewland-Woodview (Water)

Mudpike Road from Viewland to Woodview has scattered residential development. The PSA operates a small water system serving 13 customers at Woodview. Service to this area could be provided by an 8" water main extension from Christiansburg through Viewland.

Source: "Comprehensive Water and Wastewater Study" Anderson & Associates Nov. 24, 1993; "Mud Pike Area Water Agreement" Sep. 24, 1994".

Mudpike-Alternative 1 (Sewer)

Provide service to the Mudpike corridor and Viewland subdivision. The facilities required to provide public sewer service to the area for Alternative 1 consist of 9,000 L.F. of 8" sewer, a 160 gpm pump station located south of Route 666, and an 80 gpm pump station serving the Viewland Subdivision. The Viewland pump station would discharge through 2,700 L.F. of 4" force main to the Mudpike sewer. The Mudpike pump station would discharge through 2,800 feet of 6" force main to a new 8" gravity sewer connecting to the Route 661/11 Alternative 2 sewer near Route 11. The existing wastewater agreement between the Town and County requires construction of the Alternative 2 sewer in order to serve the Mudpike area.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Plum Creek-Route 11 (Sewer)

The U.S. 11 service area begins at the intersection of U.S. 11 and Route 604. It extends approximately 2,200 L.F. east along U.S. 11 and 1,000 L.F. east along Route 604. Portions of the service area are located within the area designated for urban expansion. The facilities that will be required to provide public sewer service to the area consist of 3,200 L.F. of 8" gravity sewer. The sewer will discharge flow to the existing 8" gravity sewer at the intersection of U.S. 11 and Route 604. The existing system flow is nearing the currently allocated treatment capacity of 73,000 gallons per day. Additional treatment capacity may need to be purchased prior to implementation of this alternative.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

PRICES FORK/BELVIEW PLANNING AREA (11 projects)

Prices Fork/Longshop/McCoy Water System Phase 1 (Water)

Upgrade consists of a pump station at RAAP, connecting line to Prices Fork, and improvements to the existing Prices Fork distribution system. Approximately $290,000 would be associated with improvements within the RAAP compound. Adding $250,000 to the budget will allow for construction of a new 200,000 gallon water storage tank at Prices Fork, thus providing additional fire flow capabilities.

Sources: "PER Prices Fork/Longshop/McCoy Water System Improvements" Anderson & Associates Nov. 10, 1995; "Addendum to PER Prices Fork/Longshop/McCoy Water System Improvements; Radford Army Ammunition Plant Drinking Water System Hydraulic Study" Anderson & Associates July 28, 1998.

Route 737 (Sewer)

The Route 737 service area is located along Route 737 in the southwestern portion of the Prices Fork Community. The area drains to a depression west of Route 737. The facilities required to provide public sewer service to the area consist of 9,000 L.F. of 8" sewer and an 80 gpm pump station located west of Secondary Route 737. The pump station will discharge flow through 1,700 L.F. of 4" force main to a new 8" gravity sewer that will connect to the existing collection system that services the Montgomery Farms Subdivision.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Route 685 (Sewer)

The Route 685 service area includes the area around Prices Fork Elementary School and the area along Route 685 from the school west to Route 652. The area drains to Stroubles Creek. An 8" gravity sewer was recently constructed to serve the school. Additional facilities required to provide public sewer service to the area consists of 4,400 L.F. of 8" sewer. The sewer will discharge flow to the existing collection system serving the Montgomery Farms Subdivision.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Route 654 (Sewer)

The Route 654 service area includes the area along Route 654 north of its intersection with Route 685. The are4a drains to an unnamed tributary of Big Run, which is a tributary of Toms Creek. The facilities required to provide public sewer service to the area consist of 1,200 L.F. of 8" sewer and an 80gpm pump station located west of Route 654 and north of Route 685. The pump station will discharge flow through 800 L.F. of 4" force main to the Prices Fork School sewer line. Providing service to the area is dependent on installation of public sewer service to the Prices Fork Route 685 service area.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Route 653 (Sewer)

The Route 652 service area is located along Route 652 in the northwestern portion of the Prices Fork Community. The area drains to an unnamed tributary of Big Run, which is a tributary of Toms Creek. The facilities required to provide public sewer service to the area consist of 1,700 L.F. of 8" sewer and an 80 gpm pump station located east of Route 718 and north of Route 652. The pump station will discharge flow through 1,700 L.F. of 4" force main to the prices Fork School sewer line. Providing service to this area is dependent on the installation of public sewer service to the Prices Fork Route 685 alternative service area.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993

Mountain View (Sewer)

This area is physically located within the Prices Fork Planning Area. However, it would be served by the Lower Slate Branch Interceptor and a discussion of the area was included with the Slate Branch Interceptor serving Mid-County.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Price Mountain/Oilwell Rd Waterline (Blacksburg Agreement) (Water)

Blacksburg agrees to provide to the PSA a maximum of:

216,000 gpd for Merrimac Community

57,900 gpd for Prices Mountain Northeastern Slope

46,500 gpd for Prices Mountain Foothills

18,000 gpd for Prices Mountain Middle Slope

1,500 gpd for Prices Mountain Northwestern Slope

Source: "Amendment to Water Purchase Contract Merrimac Area" July 1, 1998.

Prices Fork/Longshop/McCoy Water System Phase II (Water)

Phase II would consist of waterline improvements between the Prices Fork and Longshop communities. A new 350,000 gallon water storage tank would be constructed on Route 655 and the existing Prices Fork tank would be abandoned. A waterline extension would be made from Prices Fork to the Blacksburg corporate limits along Prices Fork Road.

Source: "PER Prices Fork/Longshop/McCoy Water System Improvements" Anderson & Associates Nov. 10, 1995.

Price's Mountain Sewer Line (Blacksburg Agreement) (Sewer)

Blacksburg agrees to accept from the PSA a maximum of:

77,200 gpd from Prices Mountain Northeastern Slope

62,000 gpd from Prices Mountain Foothills

24,000 gpd from Prices Mountain Middle Slope

2,000 gpd from Prices Mountain Northwestern Slope

Source: "Prices Mountain Sewer Service Agreement" July 1, 1998

Merrimac - Prices Fork (Water)

A line extension south from the 12 water main on Prices Fork Road at the Corporate Limits could be made to connect the Merrimac system. This would provide the primary feed to Merrimac. Growth along the Route 657 corridor is not expected to be significant. However, the project will greatly enhance system reliability for the PSA.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Merrimac Looping (Water)

Replacement of inadequate 2 lines in the existing system would boost water pressure and allow fire protection to be provided to existing and future customers along these roads. This project also includes the interconnection of the Merrimac and Merrimac/Midway systems for added reliability.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

MID-COUNTY PLANNING AREA (5 projects)

Slate Branch (Sewer)

The Lower Slate Branch Interceptor extends from the existing Stroubles Creek Interceptor to the unnamed tributary of Slate Branch that flows from the Corning Site. The Lower Slate Branch Interceptor will consist of 10,000 L.F. of 18" sewer and 9,800 L.F. of 21" sewer. Individual service areas that will connect to the interceptor will require additional facilities and are evaluated separately.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Rolling Hills (Sewer)

The Rolling Hills sewer service area contains the Rolling Hills Subdivision. It is located on Route 114 west of the Belmont Farms Subdivision. The facilities that required to provide public sewer service to the area consist of 5,200 L.F. of 8" sewer. The sewer will discharge flow directly to the existing Crab Creek wastewater treatment plant.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Belmont Estates (Sewer)

The Belmont sewer service area is located north of Route 114 adjacent to the Christiansburg Corporate Limits. The area contains the Belmont Trailer Park. The facilities required to provide public sewer service to the area consists of 4,800 L.F. of 8" sewer. The sewer will discharge flow to the Lower Slate Branch Interceptor. This system could allow the Belmont Pump Station in Christiansburg to be abandoned in the future.

Source: "Comprehensive Water & Wastewater Study" Anderson & Associates Nov. 24, 1993.

Rolling Hills West (Sewer)

The Rolling Hills West sewer service area consists of the western portion of the Rolling Hills Subdivision which will not flow by gravity to the Crab Creek treatment plant. The facilities required to provide public sewer service to the area consist of 3,200 L.F. of 8" sewer and an 80 gpm pump station located on an unnamed tributary of Crab Creek. The pump station will discharge flow through 3,000 L.F. of 4" force main to the collection system installed for the main portion of the Rolling Hills Subdivision. Providing service to this area is dependent on installation of the facilities for the Rolling Hills sewer service area.

Source: "Comprehensive Water and Wastewater Study" Anderson & Associates Nov. 24, 1993

Smart Road/Jennelle Road Waterline (Blacksburg Agreement) (Water)

Blacksburg agrees to provide to the PSA a maximum of 100,000 gpd for customers within the Jennelle Rd and Yellow Sulphur Rd service area. Blacksburg also agrees to provide to the PSA all the water required by the Virginia Department of Transportation (VDOT) to be used by VDOT in its smart highway test bed.

Source: "Jennelle Road and Yellow Sulphur Road Water and Sewer Agreement" July 1, 1998.

©Montgomery County Department of Planning
Last Updated: 5 January, 2003
Comments and suggestions should be sent to the Planning Department
Planning and GIS Services
bullet Comprehensive Planning
bullet 1990 Comprehensive Plan
bullet Bikeway/Walkway Plan
bullet Open Space Plan (not adopted)
bullet Consultant Reports
bullet Demographic Data
bullet Glossary
bullet Public Meeting Results
bullet Forms, Publications and News
bullet Sign on to the MontVa.com E-mail Lists.

 


The Official Site of Montgomery County Government.
Montgomery County is an equal opportunity employer and provider of services.